Line 19: Line 19:
   * To ensure that the system can easily be extended at the university the same RFID cards are to  be used   * To ensure that the system can easily be extended at the university the same RFID cards are to  be used
   * Include safety measures in case of calamities   * Include safety measures in case of calamities
 +
 +===== Backlog =====
 +  * [[projects:​rfid_door_lock:​backlog:​change_reader|Users want to use their FU-issued ID cards for access control]]
 +  * [[projects:​rfid_door_lock:​backlog:​arduino_ethernet|The communication between the doors and the server needs to be done through the network]]
 +  * [[projects:​rfid_door_lock:​backlog:​encryption|The webapplication needs to use encryption to make it more secure]]
 +  * [[projects:​rfid_door_lock:​backlog:​testing|We want to create a testing setup to assure product quality]]
 +  * [[projects:​rfid_door_lock:​backlog:​gorups|Users need to be divided into groups with different permissions]]
 +  * [[projects:​rfid_door_lock:​backlog:​backup_power|Each door needs to have a backup power supply in case of power failure]]
 +  * [[projects:​rfid_door_lock:​backlog:​credentials_cache|Each door needs to contain a cache of recently allowed cards in case of communication failure with the server]]
 +  * [[projects:​rfid_door_lock:​backlog:​powerful_servo|The door lock mechanism needs to be more powerful in order to minimize technical difficulties with the servo]]
 +  * [[projects:​rfid_door_lock:​backlog:​multiple_doors|Different doors/​locations need to be controlled from the same application]]
 +  * [[projects:​rfid_door_lock:​backlog:​new_housing|The users want a smaller and nicer looking housing on the doors with access control]]
 +  * [[projects:​rfid_door_lock:​backlog:​different_lock|Users want to leave the room without worrying about the door properly locking]]
 +
 +
  
 ===== Project Scope and Requirements ===== ===== Project Scope and Requirements =====
Line 63: Line 78:
 ^Total USD ^ ^ ^ ^ ^  595.00^ ^Total USD ^ ^ ^ ^ ^  595.00^
 ^Total PHP ^ ^ ^ ^ ^  28940.00^ ^Total PHP ^ ^ ^ ^ ^  28940.00^
- 
-===== Milestones ===== 
-^ Milestone ^ Title                                                    ^ Comments ​                                                           ^ Due date ^ 
-| 1.          | Draft proposal ​                                          | discuss and get ok from client. Include budget and planning. ​                   |     | 
-| 2.          | Final proposal ​                                          ​| ​                                                                                ​| ​    | 
-| 3.          | Security and privacy evaluation ​                         | All physical and electronic vulnerabilities identified and addressed ​           |     | 
-| 4.          | RFID reader and controller design ​                       |                                                                                 ​| ​    | 
-| 5.          | Management application design ​                           |                                                                                 ​| ​    | 
-| 6.          | Testing plan                                             | Requirements for testing the system and judge it successful ​                    ​| ​    | 
-| 7.          | First prototype ​                                         | Both hardware and software developed and installed ​                             |     | 
-| 8.          | First prototype tested and design adjusted ​              | After proper testing, adjust design according to test results ​                  ​| ​    | 
-| 9.          | Final prototype ​                                         | Final prototype developed and installed ​                                        ​| ​    | 
-| 10.         | Test period for final prototype completed and evaluated ​ | After a trial period for the customer, evaluate the prototype and adjust design |     | 
-| 11.         | Final version developed and installed ​                   |                                                                                 ​| ​     |    ​ 
-===== Work breakdown ===== 
-Milestone 1 
-  * Research existing (open source) tools and software for reading RFID tags 
-  * Roughly research different protocols, standards and tools for RFID communication and authentication,​ resulting in a list with short description of the tools 
-  * Research rough list of required tools and materials 
-  * Finalize our list of requirements 
-  * Make a material list and budget 
-  * Make a project planning (dates on the milestones) 
-  * Finalize this project proposal 
-  * Discuss proposal with client 
-  * Discuss client requirements 
- 
-Milestone 2 
-  * Adjust proposal 
-  * Discuss proposal with client and get final OK 
- 
-Milestone 3 
-  * Evaluate potential physical attack vectors (tampering with the hardware) 
-  * Evaluate potential local software attack vectors 
-  * Evaluate potential remote software attack vectors 
-  * Evaluate potential privacy flaws 
-  * Make software security management plan (signaling and updating security updates) 
- 
-Milestone 4 
-  * Study different standards and protocols regarding RFID/NFC authentication 
-  * Research the possibilities for the connection of the controller to the door lock 
-  * Research different libraries for RFID-reader/​controller communication 
-  * Research different hardware components, their functioning and available libraries and tools 
-  * Create a technical design for the RFID reader, it's controller and the lock 
- 
-Milestone 5 
-  * Research different open-source authentication and authorization packages supporting RFID 
-  * Make a technical design of the management software 
- 
-Rest: 
-  * Get a final OK for the the designs 
-  * Order parts 
-  * Start writing software 
-  * Make a software and hardware testing plan 
-  * Install first prototype 
-  * Train the client on use of the prototype 
-  * Test first prototype 
-  * Adjust design, hardware and software according to test results 
-  * Install final prototype 
-  * Let user evaluate the system for a while 
-  * Evaluate the system with the user in a feedback session 
-  * Create the final version based on the client'​s feedback 
-  * Install and test the final version 
- 
  
 ===== Design ===== ===== Design =====